Mechanical Expert (CCGT Thermal Power Plant)
jobtest.vn- Posted 22 hours ago
- Be among the first 10 applicants
Job Description
- Project & Location: Combined Cycle Gas Turbine (CCGT) power plant project located in Vietnam.
- Work Arrangement: Split into two phases: Phase 1 for online design review and Phase 2 for onsite construction supervision.
- Mandatory Education: Open to all nationalities, provided the candidate holds a college/university degree from Australia, New Zealand, USA, Japan, Germany, UK, France, Canada, Italy, Northern Europe, or Western Europe.
- Required Experience: Must have served in a relevant role on at least two thermal power projects (gas or coal) with a capacity exceeding 600MW.
- Design & Technical Document Review: Verify technical/detailed designs, construction measures, Inspection and Test Plans (ITP), equipment documents, and contractor reports.
- Equipment Installation Supervision: Supervise and inspect equipment installation across the turbine area, heat recovery steam generator (HRSG), main power area, auxiliary systems, and Balance of Plant (BOP).
- Generator Fabrication & Erection: Oversee inspection programs and procedures for generator sets 1 & 2 during fabrication and erection prior to testing.
- Quality Control & Acceptance: Confirm completed acceptance volumes, inspect QA/QC documentation and as-built dossiers, and participate in project technical meetings.
- Testing & Commissioning Supervision: Verify procedures and supervise the entire testing, measurement, sampling, and system interconnection process in the main machine room and BOP areas against contract requirements.
- Reliable Operation & Handover: Supervise the plant's reliable operation phase, as well as the training and transfer of factory technology to the investor.
More Info
Key Skills
Equipment Installation Supervision
Generator Fabrication Erection
Testing Commissioning Supervision
Technical Document Review