Search by job, company or skills

J

ECO Engineer (Engineering Change Orders)

new job description bg glownew job description bg glownew job description bg svg
  • Posted 19 hours ago
  • Be among the first 10 applicants
Early Applicant

Job Description

JOB DESCRIPTION

Under direct supervision, maintains assembly instructions for the manufacturing operation. Responsible for inputting bill of materials (BOM) per the new product introduction (NPI) process, obtaining material pricing for the purchasing department and verifying completion of documentation packages.

ESSENTIAL DUTIES AND RESPONSIBILITIES

Assists with the preparation and implementation of Engineering Change Orders (ECO's) for manufacturing assembly instructions

Assists with the interpretation of customer documentation, drawings and blueprints for defining manufacturing process flow.

Works with the process area and engineering to define process flow.

Updates SAP routing and production status as directed.

May assist in publishing weekly and monthly reports of department performance in accordance to established standards.

Coordinates the ECO activities for the business unit and work with other appropriate personnel to resolve problems that result from ECO activity.

Assists in the timely completion of ECOs through documentation, validation/approval and basic input of materials and drawing information into the SAP system.

Verifies ECO documentation packages for completeness and accuracy and follow up on completed ECOs to ensure continued accuracy.

Communicates ECO impact with appropriate personnel including engineering, materials and production personnel. May also interact with customer and/or supplier personnel when appropriate.

Assists in transacting excess and obsolete inventory.

Responsible for maintaining bills of material in SAP.

Performs other related duties as assigned.

May be required to work overtime.

May perform other duties and responsibilities as assigned.

JOB REQUIREMENTS

- Bachelor degree in Engineering.

- Plus 2 - 4 years manufacturing experience in various electronic assembly processes.

- Good English communication

- Knowledge of SAP, Microsoft Office and computer graphics program preferred.

More Info

Job Type:
Industry:
Function:
Employment Type:

About Company

Job ID: 137015201